Concept site. A design demonstration by Just Media Works. The business shown here is fictional.

Photographs are illustrative. Nothing here is a real offer, and the forms do not submit.

Missouri Electrical Contractor Lic. #EC-0555-0137

Office 7 a.m.–7 p.m., Mon–Sat · On call for no-power emergencies

Panel upgrades · St. Charles County, Missouri

200-amp panel upgrades, priced before we start.

Adding an EV charger, a heat pump or a finished basement to a 100- or 150-amp panel? We replace it in one day, pull the permit, and handle the inspection and the utility.

$2,400–$4,200

Typical installed price for a St. Charles County home. Permit and inspection included.

  • Written price within one business day
  • Done in one day, power off six to eight hours
  • Permit, inspection and Ameren Missouri handled
  • 12 months same as cash on approved credit

Get a written panel quote

We call back within an hour during office hours.

Rather talk? (636) 555-0137

Signs your panel is out of room

You're adding something big
An EV charger, a heat pump, a hot tub or an electric range on a 100- or 150-amp panel usually needs a load calculation first.
Breakers trip when two things run
Dryer and air conditioner, microwave and space heater. A breaker doing its job too often is telling you something.
There are no open slots
Two wires on one breaker, or half-size breakers squeezed in, means the panel was full years ago.
Warm, buzzing or scorched
A panel cover that is warm to the touch, a hum, or dark marks around a breaker. Call us the same day.
An older panel brand
Some panels from the 1970s and 80s use breakers known not to trip reliably. We will tell you on the walkthrough if yours is one.
An inspector or insurer flagged it
Selling the house, or a letter from your insurance company. We can usually schedule within a week.

What's in the price, and what moves it

Most St. Charles County homes land in the middle of the range. These are the four things that push a job toward the top, and you will know which apply before you sign anything.

Always included

  • New 200-amp panel and main breaker
  • Your existing circuits moved over and labeled
  • Grounding and bonding brought up to current code
  • Permit, inspection and the utility disconnect and reconnect
  • A temporary cord so your refrigerator stays on

What can add to it

ConditionTypical addition
The meter socket needs replacing too+$400–$900
Moving the panel to a new location+$1,200–$2,500
Code-required AFCI breakers on older circuits+$300–$700
Whole-home surge protection, added at install+$250

How it goes

  1. Step 1 · Free

    Walkthrough

    Thirty minutes in person, or a video call where you point your phone at the panel.

  2. Step 2 · 1 day

    Written price

    One number, by email, with everything included listed. It does not change unless you change the job.

  3. Step 3 · 3–7 days

    Permit

    We pull it from your city or the county and book the utility. You do not call anyone.

  4. Step 4 · 1 day

    Install

    Two electricians, power off for six to eight hours, fridge on a temporary cord the whole time.

  5. Step 5

    Inspection

    We meet the inspector so you don't have to. Then you get a typed panel directory.

Power went off at eight and was back on before my kids got home from school. The price on the quote was the price on the bill.

Alex M., St. Peters

100-amp to 200-amp upgrade · 3 weeks ago

Another company said we needed 200 amps. Jenna ran the numbers and showed us our 150 would handle the charger with a load manager. Saved us two thousand dollars.

Sam K., Dardenne Prairie

EV charger with load management · 1 month ago

Questions people ask

Do I need a permit?
Yes. A panel replacement needs a permit and an inspection from your city or, outside city limits, from St. Charles County. We know which office covers your address, pull the permit ourselves, and the cost is in your price.
How long will the power be off?
Six to eight hours on a normal install. We start at 8 a.m., keep your refrigerator running on a temporary cord, and you have power back the same afternoon.
Do I really need 200 amps?
Not always. We run a load calculation on your house before we quote. If your current panel can handle an EV charger with a load manager, we will tell you, and that job costs a fraction of an upgrade.
Can I finance it?
Yes. Twelve months same as cash, or fixed monthly payments, on approved credit. Ask on the walkthrough and we will include both options with your written price.
My house has aluminum wiring. Is that a problem?
Some 1970s homes in the county have aluminum branch wiring. We connect it with approved connectors during the upgrade and price that separately, so it is never a surprise.
Who actually does the work?
Two Linhorst electricians, both licensed in Missouri. We do not subcontract panel work.

Get one written price for your panel.